国产av天堂亚洲国产av天堂_美女羞羞喷液视频网站_精品国产AV无码一道_五月天丁香婷婷激情视频,青青欧美视频在线观看,米奇7777狠狠狠狠视频影院,欧美午夜理伦三级在线观看

Stock code:871165
Mobile phone +8613829250070 中文
Online Message Common problem

Industry information

Your current position: Home > News> Industry information

Precautions of central feed system installation

Source: Popularity:5319 Publication time:2017-11-23 15:47:29 smallmiddlebig

The central feeding system realizes the 24 hours continuous feed operation for the pellets, and can change the colors flexibly to meet the requirements of multi-color and multi-varieties of the products. Depending on the production of different molding machines, flexible changes in the amount of feed. Multiple feed pipe design, to ensure the diversification of the main requirements. The system has a variety of monitoring and protection functions, work safe and reliable. The last Hengrong technicians also introduced the advantages of planning and using the central feeding system in the injection molding workshop, and today we will share the installation precautions for the central feeding system.


中央供料系統(tǒng)


Central feed system installation has the following precautions:


1, the size of the machine placed the exact location of the way drainage pipe.
2, pay attention to the raw material room and system control layout.
3, observe the plant wall structure, determine the weight of the pipeline.
4, pay attention to the overhead crane, ceilings, pillars.
5, the central feeding pipe, try to reduce corners.
6, the pipe is allowed to control the condition about 3 meters high, easy to install and follow-up maintenance.
7, when connecting the pipe to ensure that the pipe clamp is the center of the docking, the pipeline is strictly prohibited leakage.
8, pay attention to the installation of pipe injection molding machine in charge of position, so as not to oppose it will not affect the appearance.

On the central feed system installation precautions, we introduce to you here. The ease of use of the central feed system reduces the labor costs and, secondly, the reduction of raw material belts and associated auxiliaries next to the injection molding machine increases space utilization. In addition, due to the central feeding method, correspondingly reduced a lot of stand-alone equipment, it saves energy and reduce maintenance costs, installation and application is very extensive.

Relevant information
主站蜘蛛池模板: 鹿泉市| 县级市| 白沙| 临猗县| 砚山县| 西城区| 县级市| 古蔺县| 台东市| 秭归县| 团风县| 罗田县| 西和县| 太仓市| 永仁县| 平阳县| 米泉市| 洛川县| 葵青区| 偃师市| 克拉玛依市| 柳河县| 鄂州市| 西平县| 南溪县| 正镶白旗| 云林县| 鹰潭市| 阿拉善盟| 图们市| 奎屯市| 连云港市| 呼图壁县| 建平县| 济南市| 彭阳县| 乌兰察布市| 弥勒县| 壤塘县| 赫章县| 渭南市|